Roof Walkways & Ladder Access Installation
Project Type: Roof Walkway Supply & Installation, Ladder Access, Fall Restraint LifelineLocation: Shotton Mill, Deeside, CH5 2LWScope of Work: Walkways and Ladder Access across TM1 Building, Bale Building and Reel Storage Building Overview: Think Worksafe Ltd was engaged to supply and install a comprehensive roof access and safe walkway system across multiple buildings at the…
Hemel Hempstead Leisure Centre – Safe Access Improvements
Industry Sector: Renewable EnergyLocation: Hemel Hempstead Leisure CentreScope of Work: Free comprehensive site survey, specification & design of folding guardrail systems, installation of fixed access ladders, installation of fabricated staircases.Products Used: Roofco – Rhinorail Roof Edge Protection & Peak Access Ladder along with Surpro – Fabricated Staircaseised Key Clamp Guardrail System – Alvin Key Clamp The brief: The client…
Temporary Collective Edge Protection Installation
Project Type: Temporary Collective Edge Protection InstallationLocation: Langwith, MansfieldScope of Work: Guardrail design and installation using rope access strategyProducts Used: Galvanised Key Clamp Guardrail System – Alvin Key Clamp Overview: The project presented an immediate working-at-height risk due to the proximity of the excavation area to a tank edge. With only a 200mm-wide retaining wall and a fall potential…
Handrail Installation & Safety Testing – Domis Glassworks, Manchester
Client: Domis ConstructionProject: Glassworks – Handrail Installation & TestingLocation: ManchesterDate: 28th – 30th July 2025 Project Overview Think Worksafe Ltd. was engaged by Domis Construction to undertake the installation and testing of safety handrails at the Glassworks project in Manchester. This high-rise development required a robust fall protection solution to ensure compliance with safety regulations…
Installing Safe Access Systems for PV Maintenance at Central Way (July 2025)
Installing Safe Access Systems for PV Maintenance at Central Way (July 2025) 1. Challenge Tri Construction Ltd was nearing completion of a major new-build project at Central Way, featuring a brand-new Kingspan roof system with rooftop solar PV arrays. The client’s brief received via tender provided basic layout drawings but no specification. A key requirement…